• AASHTO ARRA-2
Provide PDF Format

Learn More

AASHTO ARRA-2

  • More Projects and Paychecks: Transportation's Summer of Recovery
  • standard by American Association of State and Highway Transportation Officials, 09/01/2010
  • Publisher: AASHTO

$53.00$106.00


5The transportation investment in stimulus is working and in every state across the nation. More than $40 billion in highwayand transit projects have been approved and are moving forward - almost $30 billion are under contract on 16,761 differentprojects. More than 63,000 direct on-project jobs have been created or sustained in August as a result of the American Recoveryand Reinvestment Act and states have already paid out $3.2 billion in payroll.

Related Products

AASHTO T 279-12

AASHTO T 279-12

Standard Method of Test for Accelerated Polishing of Aggregates Using the British Wheel (ASTM D 3319..

$25.00 $50.00

AASHTO T 90-16

AASHTO T 90-16

Standard Method of Test for Determining the Plastic Limit and Plasticity Index of Soils..

$30.00 $60.00

AASHTO T 148-97 (2005)

AASHTO T 148-97 (2005)

Standard Method of Test for Measuring Length of Drilled Concrete Cores..

$18.00 $35.00

AASHTO LRFDEM-4-M

AASHTO LRFDEM-4-M

AASHTO LRFD Bridge Design Specifications, Customary U.S. Units, 4th Edition (Includes 2008 and 2009 ..

$375.00 $750.00