• ANS 2.23-2016
Provide PDF Format

Learn More

ANS 2.23-2016

  • Nuclear Plant Response to an Earthquake
  • standard by American Nuclear Society, 04/07/2016
  • Publisher: ANS

$82.00$164.00


This standard describes actions that the owner of a nuclear power plant shall take to prepare for and respond to a felt earthquake at the plant(s), including the need for plant shutdown; actions to determine the readiness of the plant to resume operation; and those evaluations necessary to verify the long-term integrity of safety-related and important structures, systems, and components. It also includes a consensus definition of operating basis earthquake exceedance, beyond which U.S. regulations require plant shutdown. Application of this revised standard provides a comprehensive, balanced plan for the response of a nuclear power plant to an earthquake.

This standard does not cover those operator actions that are performed in connection with safe operation and control of the nuclear power plant during and following an earthquake. These operations are specified in plant operating procedures, emergency procedures, alarm response procedures, and other conditions of the plant's license. Likewise, it does not cover required reporting and communications with the U.S. Nuclear Regulatory Commission. It is not applicable to nuclear facilities other than licensed nuclear power plants.

Related Products

ANS 2.3-2011

ANS 2.3-2011

Estimating Tornado, Hurricane, and Extreme Straight Line Wind Characteristics at Nuclear Facility Si..

$35.00 $70.00

ANS 3.8.5-1992

ANS 3.8.5-1992

Criteria for Emergency Radiological Field Monitoring, Sampling, and Analysis..

$28.00 $56.00

ANS 2.23-2002 (W2016)

ANS 2.23-2002 (W2016)

Nuclear Plant Response to an Earthquake..

$65.00 $129.00

ANS 15.16-2008 (W2015)

ANS 15.16-2008 (W2015)

Emergency Planning for Research Reators..

$32.00 $64.00