• ANS 2.29-2008
Provide PDF Format

Learn More

ANS 2.29-2008

  • Probabilistic Seismic Hazard Analysis
  • standard by American Nuclear Society, 07/31/2008
  • Publisher: ANS

$69.00$138.00


This standard provides criteria and guidance for performing a Probabilistic Seismic Hazard Analysis (PSHA) for the design and construction of nuclear facilities. As defined in ANSI/ANS-2.26-2004, a nuclear facility is a facility that stores, processes, tests, or fabricates radioactive materials in such form and quantity that a nuclear risk to the workers, to the off-site public, or to the environment may exist. These include, but are not limited to, nuclear fuel manufacturing facilities; nuclear material waste processing, storage, fabrication, and reprocessing facilities; uranium enrichment facilities; tritium production and handling facilities; radioactive materials laboratories; and nuclear reactors.

Related Products

ANS 8.17-1984 (R1997)

ANS 8.17-1984 (R1997)

Criticality Safety Criteria for the Handling, Storage and Transportation of LWR Fuel Outside Reactor..

$20.00 $40.00

ANS 5.10-1998 (R2013)

ANS 5.10-1998 (R2013)

Airborne Release Fractions at Non-Reactor Nuclear Facilities..

$66.00 $132.00

ANS 19.6.1-2011

ANS 19.6.1-2011

Reload Startup Physics Tests for Pressurized Water Reactors..

$61.00 $121.00

ANS 57.10-1987

ANS 57.10-1987

Design Criteria for Consolidation of LWR Spent Fuel..

$65.00 $129.00