Provide PDF Format
ANS 58.8-1994 (R2008)
- Time Response Design Criteria for Safety Related Operator Actions
- standard by American Nuclear Society, 08/23/1994
- Publisher: ANS
$35.00$70.00
Establishes time response design criteria for safety-related operator actions to be used in design of light water reactor nuclear power plants. Specifies time requirements that are to be met to receive credit in the safety analysis for operator actions.
Related Products
ANS 55.1-1979
Solid Radioactive Waste Processing System for Light-Water-Cooled Reactor Plants..
$63.00 $125.00
ANS 2.30-2015
Criteria for Assessing Tectonic Surface Fault Rupture and Deformation at Nuclear Facilities..
$114.00 $227.00
ANS 3.8.2-1995
Criteria for Functional and Physical Characteristics of Radiological Emergency Response Facilities..
$32.00 $64.00