• AWWA ACE54244
Provide PDF Format

Learn More

AWWA ACE54244

  • Innovative Design and Process Selection for New Water Source and Supply System
  • Conference Proceeding by American Water Works Association, 06/01/2001
  • Publisher: AWWA

$12.00$24.00


Hall County (County), Georgia is one of the fastest growing counties in the metropolitan Atlanta Region. The County is in the process of developing a raw water supply, reservoir and a water treatment plant (Plant) to meet anticipated growth. The source water for the proposed Plant will be a reservoir that is filled from two surface water sources. The objectives of this paper focus on the development of a new water supply and treatment system for the County that addresses the following issues: flood issues at the raw water pump station site; strict water withdrawal and minimum release requirements from the raw waterintake; wide variation in the raw water quality; concerns associated with runoff quality due to land use; wide variations in the water level in the proposed storage reservoir; current and future drinking water regulations; and, future increase in system demands and required Plant capacity. Includes table.

Related Products

AWWA JAW46205

AWWA JAW46205

Journal AWWA - Pennsylvania's Filtration Evaluation Program..

$15.00 $30.00

AWWA MTC61175

AWWA MTC61175

Low-Pressure Membrane Solids: Not Just Another WTP Sludge..

$12.00 $24.00

AWWA C652-11

AWWA C652-11

Disinfection of Water-Storage Facilities..

$48.00 $95.00

AWWA ACE70905

AWWA ACE70905

Advanced Treated Recycled Water as a Supplement to Drinking Water Supply: The Western Corridor Recyc..

$12.00 $24.00