• AWWA ACE54244
Provide PDF Format

Learn More

AWWA ACE54244

  • Innovative Design and Process Selection for New Water Source and Supply System
  • Conference Proceeding by American Water Works Association, 06/01/2001
  • Publisher: AWWA

$12.00$24.00


Hall County (County), Georgia is one of the fastest growing counties in the metropolitan Atlanta Region. The County is in the process of developing a raw water supply, reservoir and a water treatment plant (Plant) to meet anticipated growth. The source water for the proposed Plant will be a reservoir that is filled from two surface water sources. The objectives of this paper focus on the development of a new water supply and treatment system for the County that addresses the following issues: flood issues at the raw water pump station site; strict water withdrawal and minimum release requirements from the raw waterintake; wide variation in the raw water quality; concerns associated with runoff quality due to land use; wide variations in the water level in the proposed storage reservoir; current and future drinking water regulations; and, future increase in system demands and required Plant capacity. Includes table.

Related Products

AWWA WQTC69475

AWWA WQTC69475

The Sensitivity and Specificity of All Methods Approved by USEPA for the Detection of Coliforms and ..

$12.00 $24.00

AWWA JAW64988

AWWA JAW64988

Journal AWWA - Lowering the Detection Limit for Arsenic: Implications for a Future Practical Quantit..

$15.00 $30.00

AWWA JAW72293

AWWA JAW72293

Journal AWWA - Behavior of Trace Inorganic Contaminants in Drinking Water Distribution Systems..

$15.00 $30.00

AWWA MTC57632

AWWA MTC57632

Membrane Bioreactor Evaluation for Water Reuse in Seattle, Washington..

$12.00 $24.00