• AWWA ACE54270
Provide PDF Format

Learn More

AWWA ACE54270

  • Structuring Alternative Project Delivery Procurement
  • Conference Proceeding by American Water Works Association, 06/01/2001
  • Publisher: AWWA

$12.00$24.00


The rise of alternative project delivery methods over the last decade has provided water and wastewater utility managers the opportunity to draw from a spectrum of options, each with their relative advantages and disadvantages, for delivery of capital projects. This spectrum of options ranges from traditional delivery methods to various forms of integration of design, construction, operations and financing. This integration affords opportunities for substantial cost savings, scheduling benefits, and preferred risk allocations. However, it also heightens the importance of capital project procurement processes, mostnotably development of contract terms and conditions. Several recent major water plant project procurements have been characterized by extensive delineation of design requirements and performance and technical specifications related toconstruction and facility operations. These processes have involved protracted discussions of risk allocation and labored negotiations of contract terms and conditions. This paper outlines the importance of both structured selection of alternative project delivery options, and subsequent procurement processes for contracting project delivery. Strategies for minimizing both procurement time and expenditures are discussed, as well as the implications of alternative approaches to risk allocation - the centerpiece of most integrated delivery contracts. The City of Houston's recent procurement of the Northeast WaterPurification Plant and initial transmission main serves as a case study example. Includes table, figures.

Related Products

AWWA WQTC69475

AWWA WQTC69475

The Sensitivity and Specificity of All Methods Approved by USEPA for the Detection of Coliforms and ..

$12.00 $24.00

AWWA JAW64988

AWWA JAW64988

Journal AWWA - Lowering the Detection Limit for Arsenic: Implications for a Future Practical Quantit..

$15.00 $30.00

AWWA JAW72293

AWWA JAW72293

Journal AWWA - Behavior of Trace Inorganic Contaminants in Drinking Water Distribution Systems..

$15.00 $30.00

AWWA MTC57632

AWWA MTC57632

Membrane Bioreactor Evaluation for Water Reuse in Seattle, Washington..

$12.00 $24.00