• AWWA ACE54295
Provide PDF Format

Learn More

AWWA ACE54295

  • A Team Approach--Laboratory Reengineering and Procurement of a LIMS
  • Conference Proceeding by American Water Works Association, 06/01/2001
  • Publisher: AWWA

$12.00$24.00


Recently, the Portland Water Bureau (PWB) of Portland, Oregon, procured a laboratory information management system (LIMS). Despite the size of this initiative, the PWB was able to regularly incorporate the contributions of over 35 PWB stakeholders from various departments and levels throughout the entire project lifecycle. In addition, the PWB was able to successfully assimilate its LIMS consultants into its participatory environment. Working as a team, the PWB stakeholders andconsultant successfully achieved the project objectives. This paper describes how the PWB overcame the challenges of participatory management during its LIMS procurement.

Related Products

AWWA WQTC55099

AWWA WQTC55099

The Use of Electrospray Ionization (ESI) High-Field Asymmetric Waveform Ion Mobility Mass Spectromet..

$12.00 $24.00

AWWA JAW10891

AWWA JAW10891

Journal AWWA - Developing Joint Water Projects ..

$15.00 $30.00

AWWA MTC69786

AWWA MTC69786

A Bench-Scale Study for the Treatment of Ultrafiltration Reject Flows Generated at Perris Water Filt..

$12.00 $24.00

AWWA EDC51965

AWWA EDC51965

Unique Combination of Processes Reduces Cost of Barium Removal Facility..

$12.00 $24.00