• AWWA ACE54477
Provide PDF Format

Learn More

AWWA ACE54477

  • Integrated Resources Planning
  • Conference Proceeding by American Water Works Association, 06/01/2001
  • Publisher: AWWA

$12.00$24.00


This paper summarizes Chapter 10 of "Integrated Resources Planning" in the new AWWA manual, M50. Integrated resources planning or IRP is viewed as a process to tie all of the individual elements of water resources planning together. A model IRP process is described to provide a structure for preparing an integrated resource plan. The major differences between conventional water resources planning and IRP include: giving equal consideration to demand management and new supply development; consideration of risk and reliability with shortage management as an option; and, extensive public participation in the process. Selection of an integrated resource plan should consider cost-effectiveness, supply reliability, environmental impacts, financing, and public acceptability. Includes 5 references, tables, figure.

Related Products

AWWA JAW22193

AWWA JAW22193

Journal AWWA - Removal of Hepatitis A Virus and Rotavirus by Drinking Water Treatment ..

$15.00 $30.00

AWWA ACE58144

AWWA ACE58144

The Effects of Adsorption Isotherm Testing Conditions on GAC Bed Life Estimation..

$12.00 $24.00

AWWA ACE58125

AWWA ACE58125

Addressing Multiple Water Quality Issues in Well Water..

$12.00 $24.00

AWWA JAW10292

AWWA JAW10292

Journal AWWA - Choosing the Optimal Water Conservation Policy ..

$15.00 $30.00