• AWWA ACE54491
Provide PDF Format

Learn More

AWWA ACE54491

  • Estimating Future Capital Replacement Needs: An Innovative Case Study From the Central Arizona Project
  • Conference Proceeding by American Water Works Association, 06/01/2001
  • Publisher: AWWA

$12.00$24.00


The Central Arizona Project (CAP) needed an estimate of its future capital replacement and refurbishment funding needs in order to assess the adequacy of its existing wholesale water rates and the appropriate reserve levels to maintain. To meet this need, a system replacement planning analysis was prepared to estimate CAP's future capital system replacement and refurbishment funding levels. A detailed inventory database approach utilized existing CAP capital facility records, original cost data, expected useful life estimates, and facility condition assessment data to determine future capital replacement needs.Interim results provided CAP with annual capital replacement and refurbishment estimates that were used to assess the adequacy of existing wholesale water rates and reserve levels. The results were also used to help inform and educate CAP's senior management, Board of Directors, and customers on future capital funding needs. Includes tables.

Related Products

AWWA CSC59675

AWWA CSC59675

Integrated Information Systems..

$12.00 $24.00

AWWA MTC57604

AWWA MTC57604

Retrofit of Existing Conventional Treatment Process with Membrane Ultrafiltration Process..

$12.00 $24.00

AWWA JAW46203

AWWA JAW46203

Journal AWWA - Evaluating an AOP for TCE and PCE Removal..

$15.00 $30.00

AWWA JAW10518

AWWA JAW10518

Journal AWWA - Improving Energy Efficiency Through Computer Modeling ..

$15.00 $30.00