• AWWA ACE56193
Provide PDF Format

Learn More

AWWA ACE56193

  • Operational Considerations for On-Site Generated Sodium Hypochlorite for Alaska's Two Largest WTPs
  • Conference Proceeding by American Water Works Association, 06/16/2002
  • Publisher: AWWA

$12.00$24.00


This slide presentation presents information on construction of an on-site generated sodium hypochlorite for Alaska's two largest water treatment plants, Ship Creek WTP and Eklutna WTP.

Related Products

AWWA ACE71045

AWWA ACE71045

The AWWA High Tech Operator Program..

$12.00 $24.00

AWWA ACE54425

AWWA ACE54425

New Analytical Tools for Distribution System Surveillance..

$12.00 $24.00

AWWA ACE70748

AWWA ACE70748

Luggage Point Advanced Water Treatment: Benefits of the Pilot Plant in Optimizing Design and Operati..

$12.00 $24.00

AWWA ACE62982

AWWA ACE62982

The True Value of Continuous Monitoring of System Leakage and Automatic Meter Reading..

$12.00 $24.00