• AWWA ACE56255
Provide PDF Format

Learn More

AWWA ACE56255

  • Going Unconventional is the Only Way Out; Gravity Head Ensures Full-Fledged Treatment: A Case Study
  • Conference Proceeding by American Water Works Association, 06/16/2002
  • Publisher: AWWA

$12.00$24.00


Lack of electrical power, steep terrain, unskilled manpower and space constraint were some of the Himalayan hurdles faced in the proposed augmentation of the existing water treatment facility at Gangtok, India from 3.0 mgd to 7.5 mgd. Nature has benignly bestowed an ever-reliable gravity flow to partially offset this imbalance. The elevation difference between the inlet works and pure water sump of the existing plant itself was more than 50 feet. The excess head available was proposed for use in achieving completeness of the unit processes. The mechanical component was kept at a bare minimum. Retrofitting some of the existing units along with minimum possible new construction solved the issue of space. The innovations considered for implementation have possibly led to an appropriate and sustainable solution under the circumstances, thus ensuring safe water quality for this utility, while also providing a cost effective solution. Includes 9 references, figures.

Related Products

AWWA MTC64561

AWWA MTC64561

7 Years Operational Experience and Expansion of the SPMWD Plant C MF Facility..

$12.00 $24.00

AWWA C509-15

AWWA C509-15

Resilient-Seated Gate Valves for Water-Supply Service..

$41.00 $81.00

Math for Wastewater Operators Guide  Grades 1-2

Math for Wastewater Operators Guide Grades 1-2

Customers Who Bought This Also Bought..

$33.00 $66.00

AWWA EDC51972

AWWA EDC51972

The Dynamic Probe: Expert System Instrumentation for the Water and Wastewater Industry..

$12.00 $24.00