• AWWA ACE59844
Provide PDF Format

Learn More

AWWA ACE59844

  • Start-up, Testing, and Initial Operations for SPU's 180 mgd Cedar Treatment Facility
  • Conference Proceeding by American Water Works Association, 06/17/2004
  • Publisher: AWWA

$12.00$24.00


Seattle Public Utility's (SPU) new 180 mgd Cedar Treatment Facility will transition from construction to full scaleoperations in late spring 2004. The facility includes the largest application of ultraviolet (UV) technologyin the United States and is also unique given that the Cedar River Supply is unfiltered andthe project is being delivered using a Design Build Operate approach. Delivering innovativetechnology has always been challenging. This paper presents a case study of the processused to overcome the many hurdles associated with implementing UV on the Cedar project.These hurdles include the initial decision to implement UV, equipment selection, validationtesting, start-up, and final approvals. Includes reference, figures.

Related Products

AWWA ACE94285

AWWA ACE94285

Re-Engineering Water Systems to Optimize Operation and Reduce Costs..

$12.00 $24.00

AWWA WQTC65967

AWWA WQTC65967

Impact of Feed Water Quality on Biofouling of Nanofiltration Membranes Used for Drinking Water Produ..

$12.00 $24.00

AWWA QTC98230

AWWA QTC98230

Predicting Bromate Formation During Cryptosporidium Inactivation..

$12.00 $24.00

AWWA WQTC69360

AWWA WQTC69360

Investigating PAC and GAC for Taste and Odor Control as Part of a 120 MGD Treatment Plant Design Pro..

$12.00 $24.00