• AWWA ACE60074
Provide PDF Format

Learn More

AWWA ACE60074

  • Turning UV Challenges into Success in Henderson, Nevada
  • Conference Proceeding by American Water Works Association, 06/17/2004
  • Publisher: AWWA

$12.00$24.00


In 2002, the City of Henderson, Nevada, completed construction of one of the first ultraviolet (UV) disinfectionfacilities in the United States for surface water treatment. Henderson's UV project was one of the firstregulator-approved installations for Cryptosporidium inactivation in the U.S. In the past few years, theproject has received lots of attention, and many of the challenges faced on the project have influencedengineering decisions on subsequent projects around the country. This last paper on the HendersonUV project will address the successful completion of the project and the resolution of the manychallenges faced during design, construction, and start-up.The 15-mgd Henderson facility uses medium-pressure reactors for inactivation of Giardia andCryptosporidium. Following the completion of construction, the final step in implementation consistedof on-site performance testing and validation testing based on protocols developed in cooperationwith the Nevada State Health Division (NSHD). The purpose of testing was to verify performanceguarantees provided by the UV manufacturer. In November 2002, the initial on-site validation testingshowed poor disinfection performance, and the manufacturer was required to make reactormodifications that would improve disinfection performance to meet the project requirements. In May2003, modified UV reactors were successfully validated on-site. Construction to accommodate themodified reactors will be completed by the end of 2003.This paper addresses several critical topics and real-world lessons for UV projects including:providing protection against risk through the development of specifications for UV equipment,including guarantees, bonds, penalties, and courses for remedial action if necessary;the importance of designing and constructing UV facilities to provide flexibility for the future toallow for subsequent test results, technology changes, and regulatory changes;results of headloss testing and implications for plant operations;results and implications of on-site validation testing for contract compliance;incorporating validation results in establishing a control strategy and operational setpoints;planned future follow-up validation testing to meet the requirements of the US Environmental Protection Agency's UVDGM,respond to a new target inactivation level for Cryptosporidium, and to optimize system operationsunder the UVDGM; and,comparison of initial O&M and performance guarantees to actual values upon start-up.At the end of 2003, the City of Henderson will complete one of the first UV projects for drinkingwater disinfection in the U.S. This paper represents the final chapter in the well-publicizedHenderson case study. The results to be presented represent important information on theimplementation of UV disinfection that will allow utilities with subsequent UV disinfection projectsto face the same challenges successfully and to capitalize on the lessons learned.

Related Products

AWWA ACE93193

AWWA ACE93193

Putting Together the Pieces: Optimizing Corrosion Control in Philadelphia..

$12.00 $24.00

AWWA IMTECH51402

AWWA IMTECH51402

Strategic Information Systems Planning Linking Information Systems Strategic Plans to Business Objec..

$12.00 $24.00

AWWA JAW55402

AWWA JAW55402

Journal AWWA - Changes in Chlorine and DOX Concentrations in Distribution Systems..

$15.00 $30.00

AWWA WQTC65751

AWWA WQTC65751

Development of a New Column for the Measurement of Haloacetic Acids in Drinking Water by IC/MS and I..

$12.00 $24.00