• AWWA ACE61596
Provide PDF Format

Learn More

AWWA ACE61596

  • Groundwater Recovery Facility Design-Build-Operate: DBO Success and Lessons Learned
  • Conference Proceeding by American Water Works Association, 06/17/2005
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines information on a design-build-operate (DBO) project delivery approach taken by the City of San Juan Capistrano to build a groundwater recovery facility. Topics covered include: qualifications process; proposal process; DBO service agreement; transaction structure; current status of project; and, lessons learned.

Related Products

AWWA ACE94276

AWWA ACE94276

Effectiveness of Existing Greensand Filtration System for Iron and Manganese Removal..

$12.00 $24.00

AWWA WQTC52746

AWWA WQTC52746

ICR Microbiology Data--Temporal, Spatial and Source Water Characteristics..

$12.00 $24.00

AWWA INF53975

AWWA INF53975

Economic Analysis of Watermain Management Options: Cathodic Protection, "Hot Spot" Repairs..

$12.00 $24.00

AWWA ACE94216

AWWA ACE94216

Biological Drinking Water Treatment: Concepts, Issues and Performance..

$12.00 $24.00