• AWWA ACE61596
Provide PDF Format

Learn More

AWWA ACE61596

  • Groundwater Recovery Facility Design-Build-Operate: DBO Success and Lessons Learned
  • Conference Proceeding by American Water Works Association, 06/17/2005
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines information on a design-build-operate (DBO) project delivery approach taken by the City of San Juan Capistrano to build a groundwater recovery facility. Topics covered include: qualifications process; proposal process; DBO service agreement; transaction structure; current status of project; and, lessons learned.

Related Products

AWWA QTC97069

AWWA QTC97069

Three Non-Copper Algae Control Strategies..

$12.00 $24.00

AWWA WQTC57025

AWWA WQTC57025

One Stop Shopping - Expanding Client Services in a Regional Water Utility..

$12.00 $24.00

AWWA JAW6243

AWWA JAW6243

Journal AWWA - Changes in Strength of Pressurized PVC Pipe With Time ..

$15.00 $30.00

AWWA ACE60064

AWWA ACE60064

Turning a 1.5 MGD Secondary Treatment Process into a 3 MGD Tertiary Treatment Process (with MBRs) on..

$12.00 $24.00