• AWWA ACE61615
Provide PDF Format

Learn More

AWWA ACE61615

  • Commissioning Of New Residuals Handling Facilities At a Direct Filtration Plant in Phoenix, Arizona
  • Conference Proceeding by American Water Works Association, 06/17/2005
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines information on Phoenix, Arizona's Union Hills WTP 160 MGDImprovements Project. The project was done in three phases: Phase 1 involvedrebuilding the existing 32 filters andconstructing 4 new 5 MGD filters; Phase 2 involved a raw water impoundment split; Phase 3a involved pretreatment facilities and Phase 3b involved an interim dewatering building. Further topics covered include: designcriteria for residuals handling; high turbidity events; comparing operational parameters; residuals parameters during high turbidity events; raw and settled tubidities; average turbidity and production; total organic carbon removals; centrifuge dewatering parametersduring high turbidity events; residuals parameters during high turbidity events; and, residuals contingency plans.

Related Products

AWWA WQTC71412

AWWA WQTC71412

Optimization and Verification of Culture Methods for Salmonella Typhi and Vibrio cholerae O1 and O13..

$12.00 $24.00

AWWA JAW23581

AWWA JAW23581

Journal AWWA - Granular Activated Carbon for Controlling THMs ..

$15.00 $30.00

AWWA JAW11019

AWWA JAW11019

Journal AWWA - Sedimentation Success From Modified Jar Tests ..

$15.00 $30.00

AWWA JAW28476

AWWA JAW28476

Journal AWWA - Evaluating the Performance of Slow Sand Filters in Northern Idaho..

$15.00 $30.00