Provide PDF Format
AWWA ACE61628
- Pulgas Dechloramination Facility: Operational Challenges and Full-Scale Testing
- Conference Proceeding by American Water Works Association, 06/17/2005
- Publisher: AWWA
$12.00$24.00
This slide presentation outlines information on operational challenges and full-scale testing at the Pulgas Dechloramination Facility, part of the San Francisco Public Utilities Commission Regional System. Topics covered include: background of the project;dechloramination;design intent including site evaluation;operationalchallenges that included hydraulics, pH control, dechlorination and chlorinated "spikes";full-scale testingresults;future projects; and,lessons learned.
Related Products
AWWA ACE95175
FIELD LOK Gaskets, An Effective Ductile Iron Pressure Pipe Joint Restraining System..
$12.00 $24.00