• AWWA ACE61687
Provide PDF Format

Learn More

AWWA ACE61687

  • Design and Initial Operation of a Groundwater RO Plant for Nitrate Removal in Seward, Nebraska
  • Conference Proceeding by American Water Works Association, 06/17/2005
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines information on design challenges and initial operation of a groundwater reverse osmosis (RO) plant for nitrate removal. Topics covered include: history of the Seward, Nebraska, water system; corrosion control administrative study; corrosion control treatment and design challenges; design parameters; process schematic; cartridge filters; RO feed pumps and skids; induced draft degasifier tower; reservoir and product pumps; sodium hypochlorite generation; emergency generator; performance summary; costs; and, lessons learned.

Related Products

AWWA SOURCES66408

AWWA SOURCES66408

Market Research Study: Barriers and Opportunities to Sustainable Landscaping Practices in the Reside..

$12.00 $24.00

AWWA 51488

AWWA 51488

Piloting New Work Practices in Utility Maintenance..

$12.00 $24.00

AWWA JTMGT57479

AWWA JTMGT57479

Fair Impact Fees for Large Non-Residential Users..

$12.00 $24.00

AWWA JAW3798

AWWA JAW3798

Journal AWWA - Evaluating the Effects of Earthquakes on Buried Pipelines ..

$15.00 $30.00