• AWWA ACE61709
Provide PDF Format

Learn More

AWWA ACE61709

  • Claremont Corridor Seismic Improvement Project
  • Conference Proceeding by American Water Works Association, 06/17/2005
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines information on East Bay Municipal Utility District's (EBMUD) project to upgrade the Claremont Water Supply Tunnel in order to maintain service after a moderate earthquake, and to maintain lifeline service after a magnitude 7.0 earthquake. The project overview included: 1,570-foot-long permanent bypass tunnel; repair and grout existing tunnel; 2-year period of construction; and, winter tunnel outages. Further topics covered include: extensive planning and preparations; outage planning and preparations; current WOH operations; tunnel outage WOH operations; example of water quality changes; customer impacts; design criteria; and, tunnel cross sections.

Related Products

AWWA JAW23801

AWWA JAW23801

Journal AWWA - Controlling Swampy Odors in Drinking Water ..

$15.00 $30.00

AWWA DSS60350

AWWA DSS60350

Design, Construction and Operation of Denver's New Recycled Water System..

$12.00 $24.00

AWWA JAW64847

AWWA JAW64847

Journal AWWA - Process-Train Profiles of NOM through a Drinking Water Treatment Plant..

$15.00 $30.00

AWWA JAW59515

AWWA JAW59515

Journal AWWA - Expanded Summary: Protecting Watersheds from Cryptosporidium in Manure: A Literature ..

$15.00 $30.00