AWWA ACE61709
- Claremont Corridor Seismic Improvement Project
- Conference Proceeding by American Water Works Association, 06/17/2005
- Publisher: AWWA
$12.00$24.00
This slide presentation outlines information on East Bay Municipal Utility District's (EBMUD) project to upgrade the Claremont Water Supply Tunnel in order to maintain service after a moderate earthquake, and to maintain lifeline service after a magnitude 7.0 earthquake. The project overview included: 1,570-foot-long permanent bypass tunnel; repair and grout existing tunnel; 2-year period of construction; and, winter tunnel outages. Further topics covered include: extensive planning and preparations; outage planning and preparations; current WOH operations; tunnel outage WOH operations; example of water quality changes; customer impacts; design criteria; and, tunnel cross sections.