The City of Fort Worth is expanding the Rolling Hills Water Treatment Plant from 160 mgd to200 mgd capacity. As part of this expansion project, a 200-mgd raw water ozonation facility hasbeen constructed and put into operation. Ozonation was selected to meet current and futureregulatory requirements, reduce tastes and odors, and improve overall treated water quality. Thispaper presents a case study for implementing a new ozonation facility into an existing large-scaleplant and addressing the issues and challenges with such a facility. Includes 3 references, tables, figures.

Related Products

AWWA WSC67771

AWWA WSC67771

Advancing Mutual Aid/Assistance in the Water Sector: The WARN Program Expands..

$12.00 $24.00

AWWA JAW6721

AWWA JAW6721

Journal AWWA - Technical Note: Removing Trihalomethane Formation Potential by Coagulation With Activ..

$15.00 $30.00

AWWA D106-16

AWWA D106-16

Sacrificial-Anode Cathodic Protection Systems for the Interior Submerged Surfaces of Steel Water Sto..

$41.00 $81.00

AWWA WQTC65754

AWWA WQTC65754

Evaluation of Variability in Radionuclide Measurements for the Radionuclide Rule..

$12.00 $24.00