• AWWA ACE63037
Provide PDF Format

Learn More

AWWA ACE63037

  • Developing a Win-Win Project for the Beneficial Reuse of Water from Freeway Dewatering Wells to Protect Groundwater Basin Supplies
  • Conference Proceeding by American Water Works Association, 06/01/2006
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines a project for the beneficial reuse of water from the southern California I-105 Freeway in dewatering wells to protect groundwater basin supplies. Project goals/objectives included:define the cost to treat and transfer I-105dewatering well water to injection field;sample and characterize active CALTRANS wells;source water characterization;establish required process treatment train; develop the budget cost estimates; and,coordinate the results of the above with DHS. Treatment evaluation included:developed blending strategies for the secondarycontaminants (~ MCLs);evaluated three treatment trains to remove theprimary contaminants (>> MCLs); and,evaluated each train in terms ofcost, footprint, andperformance. Composite water quality models and scenarios are given along with figures for Train 1, Oxidation Filtration withGAC as Filter Media, and Train 3, Air Stripping plus OxidationFiltration plus Liquid Phase granular activated carbon (GAC).

Related Products

AWWA WQTC50390

AWWA WQTC50390

Practical Approaches to Mitigate Filter Clogging Problems in Conventional Water Treatment Plants..

$12.00 $24.00

AWWA ACE94060

AWWA ACE94060

Filtration Avoidance Under the Surface Water Treatment Rule: Defining the Issues..

$12.00 $24.00

AWWA JAW3912

AWWA JAW3912

Journal AWWA - Reservoir Coatings Can Support Bacterial Growth ..

$15.00 $30.00

AWWA MTC69680

AWWA MTC69680

Eliminating Acid from Brackish Water Reverse Osmosis Operations: A Case Study..

$12.00 $24.00