• AWWA ACE63085
Provide PDF Format

Learn More

AWWA ACE63085

  • Three Generations of Membranes in One Water Treatment Plant Over an Eight Year Period, and One More to Go, At Least for Now: The Raymond A. Barker Ultrafiltration Water Treatment Plant Experience
  • Conference Proceeding by American Water Works Association, 06/01/2006
  • Publisher: AWWA

$12.00$24.00


This article discusses the performance of three generations of membranes in the Raymond A. BarkerUltrafiltration Water Treatment Plant (WTP) over the past eight years; the strategy for retrofitting two ofthe existing trains/basins with a completely different generation of membranes; and, the task commencedby the Collingwood Public Utilities (CPU) for researching and grouping the most permeable membrane modules from five trains to threetrains. Includes tables, figures.

Related Products

AWWA JAW19886

AWWA JAW19886

Journal AWWA - Test Procedures for Determining Cavitation Limits in Control Valves ..

$15.00 $30.00

AWWA ACE58145

AWWA ACE58145

Distribution System Water Quality Following Blending Surface, Ground, and Saline Sources..

$12.00 $24.00

AWWA ACE58241

AWWA ACE58241

Susquehanna Water Rights: Big-Inch Keeps Flowing..

$12.00 $24.00

AWWA ACE58095

AWWA ACE58095

Chemical Well Rehabilitation..

$12.00 $24.00