Provide PDF Format
AWWA ACE63096
- Integrated Water Infrastructure Master Planning for Dallas Water Utilities
- Conference Proceeding by American Water Works Association, 06/01/2006
- Publisher: AWWA
$12.00$24.00
This slide presentation outlines integrated water infrastructure master planning for Dallas Water Utilities (DWU). Project objectives included: prepare for future growth;reinvestment / renewal of existing infrastructure; and, GASB 34 Compliance. Topics outlined include: complexity of DWU; phased project approach designed toeffectively meet DWU's needs; model attributionand data sets; model calibration and results; pipeline assessment approach; rehab/replacement program; remaining life of existing infrastructure; and, distribution systemasset value evaluation. Includes tables, figures.
Related Products
AWWA JAW19886
Journal AWWA - Test Procedures for Determining Cavitation Limits in Control Valves ..
$15.00 $30.00
AWWA ACE58145
Distribution System Water Quality Following Blending Surface, Ground, and Saline Sources..
$12.00 $24.00