• AWWA ACE63162
Provide PDF Format

Learn More

AWWA ACE63162

  • Responding to the Immediate Requirements of the Stage 2 DBPR and LT2ESWTR
  • Conference Proceeding by American Water Works Association, 06/01/2006
  • Publisher: AWWA

$12.00$24.00


The Stage 2 Disinfection Byproduct Rule (DBPR) and the Long Term 2 Enhanced Surface WaterTreatment Rule (LT2ESWTR) were promulgated in the Federal Register on January 4, 2006, andJanuary 5, 2006, respectively. These rules have multiple urgent requirements, including therequirement for utilities to do an initial distribution system evaluation (IDSE), disinfectionbenchmarking, and source water monitoring. This paper focuses on the aspects of theseregulations that must be implemented early. Utility examples are used to illustrate the regulatoryrequirements. Includes tables, figure.

Related Products

AWWA ACE58167

AWWA ACE58167

Confirming the Role of Aluminum Solids and Chlorine in Copper Pitting Corrosion..

$12.00 $24.00

AWWA ACE94084

AWWA ACE94084

Aquifer Testing for Public Water Supplies..

$12.00 $24.00

AWWA MTC93027

AWWA MTC93027

Nitrate Rejection by POU Membrane Processes..

$12.00 $24.00

AWWA JAW10330

AWWA JAW10330

Journal AWWA - Granular Activated Carbon Installations ..

$15.00 $30.00