• AWWA ACE65082
Provide PDF Format

Learn More

AWWA ACE65082

  • Navigating Through Changing Times - Operations and Maintenance Planning for a New 363 ML/day OBM Plant
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


This slide presentation introduces the South Peel Water Supply System, outlines Ozone Biologically Activated Carbon Contactors and Membrane (OBM) plants and how they work, and describes management and planning strategies used for 363 ML/day OBM Capital Expansion related to staffing and development plan, maintenance planning, and minimizing construction impacts on existing and new operations. Includes tables, figures.

Related Products

AWWA WQTC64147

AWWA WQTC64147

Treatment Concept for Future Drinking Water Production..

$12.00 $24.00

AWWA ACE69085

AWWA ACE69085

Adapting to Climate Change in The Netherlands..

$12.00 $24.00

AWWA PATH50788

AWWA PATH50788

Modelling the Impact of Prior Immunity on the Epidemiology of Outbreaks of Cryptosporidiosis..

$12.00 $24.00

AWWA ACE93251

AWWA ACE93251

State Water for Santa Barbara County: Pipeline Design Through an Environmentally Sensitive Area..

$12.00 $24.00