• AWWA ACE65082
Provide PDF Format

Learn More

AWWA ACE65082

  • Navigating Through Changing Times - Operations and Maintenance Planning for a New 363 ML/day OBM Plant
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


This slide presentation introduces the South Peel Water Supply System, outlines Ozone Biologically Activated Carbon Contactors and Membrane (OBM) plants and how they work, and describes management and planning strategies used for 363 ML/day OBM Capital Expansion related to staffing and development plan, maintenance planning, and minimizing construction impacts on existing and new operations. Includes tables, figures.

Related Products

AWWA WQTC64011

AWWA WQTC64011

Indirect Detection of Intentional Chemical Contamination in the Distribution System Using Low Cost T..

$12.00 $24.00

AWWA DSS92016

AWWA DSS92016

Corrosion Failures in the Water Industry Case Histories..

$12.00 $24.00

AWWA WQTC69386

AWWA WQTC69386

Implementation of Low-Pressure Membrane Technology: Estimating Log-Removal Value (LRV) Uncertainty u..

$12.00 $24.00

AWWA ACE70859

AWWA ACE70859

The Effect of Partial Lead Service Line Replacements on Lead Leaching..

$12.00 $24.00