• AWWA ACE65092
Provide PDF Format

Learn More

AWWA ACE65092

  • Using Risk and Criticality for Large-Diameter Pipeline Asset Management
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines an effort to use risk and criticality for asset management of a large-diameter pipeline. The asset management continuous life cycle is presented first, along with the objectives of a large-diameter pipe assessmentprogram that include:failure prevention;which lines to inspect;frequency, technology, cost;which lines to protect;technology, cost, schedule; and,which lines to replace or rehabilitate;technology, cost, schedule. The presentation compares a large-diameter program vs. a small-diameter program. Risk assessment/management is presented in terms of likelihood of failure and consequences of failure. Further topics outlined include: program development for large mains; Examples of Pipe Classification forAssessment Plan Development; Elements of an Assessment Plan; Case Study - DWUInventory of Large Diameter Mains; Recommended Inspection TechniquesPCCP and Steel Pipe; Soil Sampling & Testing; Soil Characteristics; Prioritized 10-Year Program - 36-inch & Larger; Inspection Recommendations & Budgets; Small-diameter vs. Large-diameterBudget Recommendations (10-year average); and, lessons learned. Includes tables, figures.

Related Products

AWWA ACE93130

AWWA ACE93130

Determination of Radium 226 by EPA Method 900.1 - The Gross Radium Alpha Screening Procedure..

$12.00 $24.00

AWWA WQTC65777

AWWA WQTC65777

Modeling Approach to Treatability Analyses: Impact of Source Water Degradation on an Existing Treatm..

$12.00 $24.00

AWWA ACE94063

AWWA ACE94063

Building Better Relationships Through Public Information..

$12.00 $24.00

AWWA IMTECH51380

AWWA IMTECH51380

Collecting System Data Using Transient Tests and Inverse Models..

$12.00 $24.00