• AWWA ACE65106
Provide PDF Format

Learn More

AWWA ACE65106

  • It Meets the Spec... Really!!
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation attempts to identify the problems associated with adding manufacturers after specifications have been developed, demonstrate how to modify a bad Bid Form, maintaining engineer and owner control, and present a real life project that the manufacturers got thrown under the bus and how it hurt the engineer in the long run. Recommendations include: have "me too" manufactures develop drawing and calculation submittal package to be evaluated prior to the bid; and, "want to be" named manufacturers should be required to review the specification line by line and make comments as to any discrepancies and explain the differences.

Related Products

AWWA DSS60330

AWWA DSS60330

Developing Nashville's Master Water Plan..

$12.00 $24.00

AWWA CONS51061

AWWA CONS51061

Rates, Water Budgets and Outdoor Water Use..

$12.00 $24.00

AWWA ACE99537

AWWA ACE99537

Leveraging Optimization Success Throughout a Utility..

$12.00 $24.00

AWWA ACE95175

AWWA ACE95175

FIELD LOK Gaskets, An Effective Ductile Iron Pressure Pipe Joint Restraining System..

$12.00 $24.00