• AWWA ACE65106
Provide PDF Format

Learn More

AWWA ACE65106

  • It Meets the Spec... Really!!
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation attempts to identify the problems associated with adding manufacturers after specifications have been developed, demonstrate how to modify a bad Bid Form, maintaining engineer and owner control, and present a real life project that the manufacturers got thrown under the bus and how it hurt the engineer in the long run. Recommendations include: have "me too" manufactures develop drawing and calculation submittal package to be evaluated prior to the bid; and, "want to be" named manufacturers should be required to review the specification line by line and make comments as to any discrepancies and explain the differences.

Related Products

AWWA WQTC64147

AWWA WQTC64147

Treatment Concept for Future Drinking Water Production..

$12.00 $24.00

AWWA ACE69085

AWWA ACE69085

Adapting to Climate Change in The Netherlands..

$12.00 $24.00

AWWA PATH50788

AWWA PATH50788

Modelling the Impact of Prior Immunity on the Epidemiology of Outbreaks of Cryptosporidiosis..

$12.00 $24.00

AWWA ACE93251

AWWA ACE93251

State Water for Santa Barbara County: Pipeline Design Through an Environmentally Sensitive Area..

$12.00 $24.00