Provide PDF Format
AWWA ACE65106
- It Meets the Spec... Really!!
- Conference Proceeding by American Water Works Association, 06/01/2007
- Publisher: AWWA
$12.00$24.00
This powerpoint presentation attempts to identify the problems associated with adding manufacturers after specifications have been developed, demonstrate how to modify a bad Bid Form, maintaining engineer and owner control, and present a real life project that the manufacturers got thrown under the bus and how it hurt the engineer in the long run. Recommendations include: have "me too" manufactures develop drawing and calculation submittal package to be evaluated prior to the bid; and, "want to be" named manufacturers should be required to review the specification line by line and make comments as to any discrepancies and explain the differences.
Related Products
AWWA WQTC69384
Differential Absorbance Spectroscopy in the Examination of Proton and Copper-Binding Properties of S..
$12.00 $24.00
AWWA WQTC65709
The Influence of Water Chemistry on Dissolution Rates of Lead Corrosion Products..
$12.00 $24.00
AWWA ACE63218
Seasonal Variations in the Contribution of Wastewater to DBP Formation in Drinking Water..
$12.00 $24.00