• AWWA ACE65160
Provide PDF Format

Learn More

AWWA ACE65160

  • Utilizing Strategic AM to Improve Utility Performance
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins with a review of the evolution of the basic framework models, or "The Conceptual Toolkit", including:output measurement; business process measurement; balanced elements; and,basic views of asset management (AM). Information is then presented onintegrating AM & performance management (PM) including: emergent models;output: the "KPI" Approach; and,balanced process: The "Best Practice" Approach. Includes tables, figures.

Related Products

AWWA JAW62648

AWWA JAW62648

Journal AWWA - 125 Years - Fulfilling the Mission..

$15.00 $30.00

AWWA ACE95146

AWWA ACE95146

Minimizing Water Deficits on Lantau Island, Hong Kong Through Leak Detection and Water Loss Reducti..

$12.00 $24.00

AWWA MTC64540

AWWA MTC64540

Global Membrane Waste Stream Options..

$12.00 $24.00

AWWA ACE58092

AWWA ACE58092

Deposition in Piping: The Hidden Energy Loss..

$12.00 $24.00