• AWWA ACE65198
Provide PDF Format

Learn More

AWWA ACE65198

  • An Innovative Approach to Improve Active Leak Detection Success
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


One of the fundamental activities of an effective Water Loss Control Strategy is ActiveLeakage Control. Typically this involves two steps, first the use of acoustic noisedetection equipment to identify potential leak areas, then noise correlators andgeophones are used to pinpoint the leak position prior to sending out watermain repairscrews. The City of Ottawa's Drinking Water Services staff has recently developed andimplemented an innovative mapping system to graphically present the recorded noiselevels within its 2,700 km (1674 mi) water distribution system. Data collectedthematically mapped based on leak noise intensity measured within distinct zones in thewater system. Using visual analysis, the noise maps are used to prioritize areas wherethe probability of leaks is highest based on noise clusters. Pinpointing is then focusedon these areas to achieve greater success in locating leak positions. This approach will result in the decrease in the leak run time and increase the confidencelevel of each initiated repair by reducing the number of costly "dry hole" excavations. Toensure the area is leak free, a post survey is completed after the repair to ensure theelimination of the noise cluster. Field data is presented, highlighting the success ofthis iterative and live process for both day and night leak surveys. Lessons learned andrecommended practices are shared to assist other municipalities who are embarkingon an Active Leakage Control Program. Includes tables, figures.

Related Products

AWWA ACE61771

AWWA ACE61771

Galvanic Corrosion of Lead Bearing Plumbing Devices..

$12.00 $24.00

AWWA ACE90106

AWWA ACE90106

Iron and Manganese Sequestration by Polyphosphates..

$12.00 $24.00

AWWA JAW49870

AWWA JAW49870

Journal AWWA - Legislation/Regulation -- IESWTR Targets Poorly Performing Filtration Plants..

$15.00 $30.00

AWWA ACE63108

AWWA ACE63108

Are Water Budget Rate Structures Superior to Other Water Conservation Rate Structures?..

$12.00 $24.00