• AWWA ACE65278
Provide PDF Format

Learn More

AWWA ACE65278

  • Desalination in the Desert: Conception to Construction
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by listing reasons for using desalination in El Paso, Texas including:preservation of fresh groundwater reserves;supplement surface supply in drought years;optimize conjunctive water use within basin; and,utilization of extensive brackish groundwatersupply. Preliminary design investigations are listed, along with JDF design capacity, Source Water and Blend Water Quality; target finished water quality, plant process flow diagram, module design, concentrate disposal - critical component, passive evaporation, enhanced evaporation, Deep Well Disposal - Selected Alternative, Brine Disposal Cost Matrix, Injection Well Northeast Area Selected, Injection Well Permitting, Mineral Precipitation Concerns, and JDF Project Construction Cost Summary.

Related Products

AWWA JAW36173

AWWA JAW36173

Journal AWWA - Quality Degradation: Implications for DBP Formation..

$15.00 $30.00

AWWA ACE92095

AWWA ACE92095

Converting a Surface Water Supply From Agricultural to Municipal Use..

$12.00 $24.00

AWWA WQTC52839

AWWA WQTC52839

Treatment of N-Nitrosodimethylamine (NDMA) by Pulsed-Ultraviolet (UV) Irradiation and Pulsed-UV/Hydr..

$12.00 $24.00

AWWA SOURCES66475

AWWA SOURCES66475

Assessing the Effectiveness of Conservation Measures for the North Texas Municipal Water District..

$12.00 $24.00