• AWWA ACE65292
Provide PDF Format

Learn More

AWWA ACE65292

  • Responding to Proposed Rule Changes and Trends Related to Lead Corrosion Control and Simultaneous Compliance with All Rules
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation outlines topics that include: summarize the proposed changes to theLead and Copper Rule;Simultaneous Compliance Considerations; Simultaneous Compliance Examples;Trends Related to Lead Corrosion Controland Simultaneous Compliance; and, Recent Examples Related to Lead CorrosionControl and Simultaneous Compliance. Conclusions were that:Recent Lead Detections and Investigations inWashington DC, Durham NC and other LocationsReveal Simultaneous Compliance Issues with theDBPR and Lead and Copper Rule;Recently Developed Materials such as the MDBPSimultaneous Compliance Guidance ManualShould be Consulted before Making anySignificant Process Changes;Changes in oxidant/disinfectant and coagulantCl:SO4 ratio have been found to impact leadcorrosion significantly, past guidance on leadcorrosion showed impacts of pH, inhibitors suchas phosphates and silicates, hardness, alkalinity,total dissolved solids, bio-corrosion, etc.;Proposed Changes to the Lead and Copper RuleSeek to Help Address Recent Trends by measuressuch aspreventing water systems above the lead actionlevel from remaining on a reduced schedule basedon maintaining Water Quality parameters, andrequiring water systems to provide advancednotice to the primacy agency of intended changesin treatment or source water that could increasecorrosion of lead; and,make only one major process change at a time andevaluate corrosion control before and after eachchange.

Related Products

AWWA JAW25789

AWWA JAW25789

Journal AWWA - Using Activated Carbon to Remove Toxicity from Drinking Water Containing Cyanobacteri..

$15.00 $30.00

AWWA JAW31506

AWWA JAW31506

Journal AWWA - Assimilable Organic Carbon as an Indicator of Bacterial Regrowth..

$15.00 $30.00

AWWA ACE68599

AWWA ACE68599

Expanded QualServe Capabilities Provide Performance Improvement for Utilities..

$12.00 $24.00

AWWA C225-07

AWWA C225-07

Fused Polyolefin Coating Systems for the Exterior of Steel Water Pipelines..

$38.00 $76.00