• AWWA ACE65431
Provide PDF Format

Learn More

AWWA ACE65431

  • A Simple Process for the System Wide Prioritization of Water Main Improvement Areas
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


The objective of this paper was to provide utilities with a method that allows for the prioritization of water main infrastructure improvement areas using commonly available, and simple to obtain, water infrastructure data. The method is referred to as the Water Main Infrastructure Number (WIN) method and utilizes infrastructure asset management concepts in order to make maximum use of commonly available utility information.The end result is a methodical prioritization of all water main improvement areas within the water utility service area, which in turn, enables for a cost efficient handling of water main improvement needs. Includes 2 references, tables, figures.

Related Products

AWWA CONS51055

AWWA CONS51055

Unaccounted-For Water: Costs and Benefits of Water Loss and Revenue Recovery in Four Vermont Municip..

$12.00 $24.00

AWWA EDC52014

AWWA EDC52014

Living With the Lowest Bidder - The Solution May be Partnering..

$12.00 $24.00

AWWA C215-99

AWWA C215-99

Extruded Polyolefin Coatings for the Exterior of Steel Water Pipelines..

$23.00 $45.00

AWWA JAW3852

AWWA JAW3852

Journal AWWA - Groundwater Recharge Operations in California ..

$15.00 $30.00