• AWWA ACE68601
Provide PDF Format

Learn More

AWWA ACE68601

  • Controlling Chaos: Managing Rising Capital Costs
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


Water utilities are in the early stages of a 40 year period (referred to as the Dawn of theReplacement Era) of steadily rising capital costs. The implications of these rising capitalneeds and some disturbing recent cost trends (rising raw materials costs, supply-demandconditions, shortages of skilled construction workers) could result in annual rate increasesin excess of 3 times the rate of inflation. This paper describes an Awwa ResearchFoundation study called "Improving Water Utility Capital Efficiency" whose product willbe an interactive CD that will walk a utility through the process ofbecoming Capital Efficient. The accompanying powerpoint presentation includes screenshots of some of the spreadsheets in the model. Includes figures.

Related Products

AWWA IMTECH51417

AWWA IMTECH51417

Is Your GIS Ready for Hydraulic Modeling? (Madison Water Utility - A Case Study)..

$12.00 $24.00

AWWA DSS65643

AWWA DSS65643

Process Design for Design-Build Projects..

$12.00 $24.00

AWWA ACE95038

AWWA ACE95038

Critical Assessment of Radon Removal Systems for Drinking Water Supplies..

$12.00 $24.00

AWWA ACE94046

AWWA ACE94046

From Cholera to Cancer to Cryptosporidiosis..

$12.00 $24.00