• AWWA ACE68605
Provide PDF Format

Learn More

AWWA ACE68605

  • From Chaos to Crisis to Kumbaya
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation presents Alternate Project Delivery (APD) methods which were developedto address weaknesses in the traditional design-bid-build(D-B-B) delivery method. Advantages of APD methods are provided, along with APD challenges, APD contact information, and increased owner control.

Related Products

AWWA B302a-99

AWWA B302a-99

Addendum to B302-95 Standard for Ammonium Sulfate..

$9.00 $18.00

AWWA DSS63720

AWWA DSS63720

DCWASA Lead Experience and Its Effects on the LCR..

$12.00 $24.00

AWWA WQTC59008

AWWA WQTC59008

Removing Musty/Earthy Taste and Odor Using Ozone-Assisted Biofiltration: Pilot Study Findings and Fu..

$12.00 $24.00

AWWA SOURCES55652

AWWA SOURCES55652

Estimating the Saturation of Water Efficient Residential Plumbing Devices: Issues, Strategies and Fi..

$12.00 $24.00