Provide PDF Format
AWWA ACE68788
- Installing Ductile Iron Pipe Using Horizontal Directional Drilling
- Conference Proceeding by American Water Works Association, 11/01/2008
- Publisher: AWWA
$12.00$24.00
This powerpoint presentation begins by providing a brief overview of Horizontal Directional Drilling (HDD) and the HDD process including the following steps: Step 1 - pilot hole; Step 2 - ream; and, Step 3 - pull-back. HDD equipment is presented, along with HDD market analysis and market growth, HDD advantages and product materials, and design considerations. Three examples of using HDD technology are provided.
Related Products
AWWA ACE95175
FIELD LOK Gaskets, An Effective Ductile Iron Pressure Pipe Joint Restraining System..
$12.00 $24.00