Provide PDF Format
AWWA ACE68798
- Pipe Life and Renewal Prioritization: Asset Management Practices
- Conference Proceeding by American Water Works Association, 11/01/2008
- Publisher: AWWA
$12.00$24.00
This powerpoint presentation begins by providing a brief overview of asset management. Evaluation of pipe life cycle /probability of failure is presented, along withpipe performance / riskcriteria, andprioritization and decisionmaking. The benefits of the main replacement project planning approach include the following:provides an auditable approach tomains renewal;calibrated to match distributionsystem;configured to represent criticaldrivers for renewal decisions;easily enhanced as driverschange or more data becomesavailable; and,financial savings in renewal coststhrough project planning and byoptimizing renewal efforts. Includes figures.
Related Products
AWWA WQTC60611
Comparison of an Anionic Polymer to No Polymer Addition for Treating Filter Backwash Water..
$12.00 $24.00
AWWA MTC64524
Integrated Approach to Construction and Startup of the 96 mgd Lakeview WTP for the Region of Peel..
$12.00 $24.00
AWWA ACE59836
Water Conservation in Georgia Bringing Efficiency into Mainstream Thinking..
$12.00 $24.00