This powerpoint presentation begins by providing a brief overview of a phased expansion plan for the Yuba City water treatment plant. Alternatives for plant expansion are presented, and an upgrade of the existing Flocculation/Sedimentation basins was selected that included anexpansion with submerged membranes. Submerged membrane design is presented, along with the CIP/backwash system, important factors for submergedmembrane retrofit, commissioning and start-up issues, commissioning data and summary, and operating data. Includes tables, figures.

Related Products

AWWA DSS60330

AWWA DSS60330

Developing Nashville's Master Water Plan..

$12.00 $24.00

AWWA CONS51061

AWWA CONS51061

Rates, Water Budgets and Outdoor Water Use..

$12.00 $24.00

AWWA ACE99537

AWWA ACE99537

Leveraging Optimization Success Throughout a Utility..

$12.00 $24.00

AWWA ACE95175

AWWA ACE95175

FIELD LOK Gaskets, An Effective Ductile Iron Pressure Pipe Joint Restraining System..

$12.00 $24.00