• AWWA ACE68877
Provide PDF Format

Learn More

AWWA ACE68877

  • Now the Membrane Is in the Basin, So How Does It Work? Start Up and Concurrent Operation of Submerged Membrane with Conventional Filtration
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of a phased expansion plan for the Yuba City water treatment plant. Alternatives for plant expansion are presented, and an upgrade of the existing Flocculation/Sedimentation basins was selected that included anexpansion with submerged membranes. Submerged membrane design is presented, along with the CIP/backwash system, important factors for submergedmembrane retrofit, commissioning and start-up issues, commissioning data and summary, and operating data. Includes tables, figures.

Related Products

AWWA JAW57690

AWWA JAW57690

Journal AWWA - Update on USEPA's Drinking Water Regulations..

$15.00 $30.00

AWWA ACE56317

AWWA ACE56317

Design, Construction, Commissioning and Operation of the World's First Large Scale Miex(R) Water Tre..

$12.00 $24.00

AWWA MTC95032

AWWA MTC95032

Assessment of MS2 Bacteriophage, Giardia Cysts, Cryptosporidium Oocysts and Organic Carbon Removals..

$12.00 $24.00

AWWA IMTECH64733

AWWA IMTECH64733

Leveraging GIS and Embedded Sensor Networks to Control Combined Sewer Overflow Events..

$12.00 $24.00