• AWWA ACE68879
Provide PDF Format

Learn More

AWWA ACE68879

  • Facts Prove Value of Seattle's Cedar Design-Build-Operate Approach
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of the Seattle area regional water system. The primary treated water qualityimprovement objectives included the following:Disinfection - 3-log Cryptosporidium,4-log Giardia,5-log Virus; and,Taste/Odor- Reduce Flavor Profile Analysis number to 3 or less. Seattle's Design-Build-Operate (DBO) project philosophy is presented, along with a DBO service agreement withCH2M HILL signed on April 30, 2001 todesign, secure all permits, and constructthe 180-mgd Cedar Water TreatmentFacilities in 30 months; and, tooperate and maintain the facilities for a15-year period, with two optional 5-yearrenewal periods. A unique ozone/UV treatment process wasdeveloped to achieve primary waterquality improvement objectives, along with an integrated supervisory control and data acquisition (SCADA)system that was developed by a jointengineering/operations team. The Cedar WTPs weresuccessfully placed into serviceon schedule in the fall of 2004. Topics covered include: key O&M agreement provisions; continuous water qualitymonitoring and control relative tocontract requirements was provided by SCADA; 2007 compliance with disinfection; finished water taste/odordramatically improved; O&M agreement cost considerations; liquidated damagesincluded to drive meeting quantityand quality requirements; incentive paymentsfor superior performance; productivity adjustments incentivizeefficient operation; productivity adjustments for powercost continue to be a challenge; chemical productivity costadjustment has improved; environmental monitoringand reporting to King County isanother contract requirement; long-term maintenance provisions area key aspect of the service agreement; DBO approach clearly resultedin economical O&M cost; and, the Cedar DBOproject in retrospect. Includes tables, figures.

Related Products

AWWA MTC61187

AWWA MTC61187

Consideration of Naturally Occurring Toxins and Seawater Desalination Facilities in Carlsbad and Hun..

$12.00 $24.00

AWWA ACE91008

AWWA ACE91008

Corrosion and Metal Leaching..

$12.00 $24.00

AWWA DSS58716

AWWA DSS58716

Impacts of Enhanced Coagulation on Corrosion of Water Treatment Plant Infrastructure..

$12.00 $24.00

AWWA INF55789

AWWA INF55789

Outpost 5(TM): Standardized Water and Wastewater Monitoring and Control System..

$12.00 $24.00