• AWWA ACE68890
Provide PDF Format

Learn More

AWWA ACE68890

  • Do It Right: A Structured Approach to Selecting a Project Delivery Method
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by presenting traditional v. alternative public workscontracting, and goes on to cover the following topics:a disciplined delivery method selectionprocess;industry trendlines and contractor market;performance guarantees and reasonablerisk transfer;alternative project delivery in practice; and,municipal retained rights and control.

Related Products

AWWA ACE59939

AWWA ACE59939

Effect of Humic Acid on Bromate Reduction by Zero Valent Iron..

$12.00 $24.00

AWWA C300-97

AWWA C300-97

Reinforced Concrete Pressure Pipe, Steel-Cylinder Type, for Water and Other Liquids..

$23.00 $45.00

AWWA MTC64614

AWWA MTC64614

RO Process Design Optimization Based on Stochastic Cost Estimation Model Coupled with Process Perfor..

$12.00 $24.00

AWWA WQTC52875

AWWA WQTC52875

Low Pressure UV Inactivation of Cryptosporidium parvum and Giardia lamblia Based on Infectivity Assa..

$12.00 $24.00