• AWWA ACE68916
Provide PDF Format

Learn More

AWWA ACE68916

  • Pilot-Scale Evaluation and Design of a MIEX System for Compliance with the Stage 1 and 2 D&DBPRs for a Small System
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This study begins by providing a brief overview of the city of Carrabelle, Florida. Project objectives include the following: provide modular treatment units for ease offuture capacity expansion;provide the initial treatment system withsufficient capacity to treat the near termgrowth only, with initial installation;depend on modular nature of selectedtechnology to expand capacity whenrequired;treat water to resolve DBP complianceproblems and other regulatory requirementsof concern;defer treatment for aesthetic issues due tobudgetary constraints; maximize use of existing infrastructure;do not adversely impact the sanitary sewertransmission or treatment system withtreatment residuals;if technically and economically feasible,utilize the same treatment technology forboth systems; and,provide an operator-friendly system. Water quality and treatment goals are presented, along withalternatives analysis, pilot-study results, design considerations, andcurrent project status. Includes tables, figures.

Related Products

AWWA WQTC50414

AWWA WQTC50414

Portacel Trent Liquid Doser System for Sodium Hypochlorite..

$12.00 $24.00

AWWA ACE63131

AWWA ACE63131

Combining Efficiency and Creativity to Finance Reuse Water Infrastructure Improvements..

$12.00 $24.00

AWWA WQTC59021

AWWA WQTC59021

Strategies for Bromate Control in Drinking Water Ozonation..

$12.00 $24.00

AWWA ACE56349

AWWA ACE56349

Landscape Conservation in Non-Crisis Times: Some Innovative Strategies from Colorado..

$12.00 $24.00