• AWWA ACE68916
Provide PDF Format

Learn More

AWWA ACE68916

  • Pilot-Scale Evaluation and Design of a MIEX System for Compliance with the Stage 1 and 2 D&DBPRs for a Small System
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This study begins by providing a brief overview of the city of Carrabelle, Florida. Project objectives include the following: provide modular treatment units for ease offuture capacity expansion;provide the initial treatment system withsufficient capacity to treat the near termgrowth only, with initial installation;depend on modular nature of selectedtechnology to expand capacity whenrequired;treat water to resolve DBP complianceproblems and other regulatory requirementsof concern;defer treatment for aesthetic issues due tobudgetary constraints; maximize use of existing infrastructure;do not adversely impact the sanitary sewertransmission or treatment system withtreatment residuals;if technically and economically feasible,utilize the same treatment technology forboth systems; and,provide an operator-friendly system. Water quality and treatment goals are presented, along withalternatives analysis, pilot-study results, design considerations, andcurrent project status. Includes tables, figures.

Related Products

AWWA ACE61732

AWWA ACE61732

Fast-Reacting Chlorinated Disinfection Byproduct Precursors..

$12.00 $24.00

AWWA ACE93054

AWWA ACE93054

Drinking Water Vulnerability Assessments in Texas..

$12.00 $24.00

AWWA WQTC60646

AWWA WQTC60646

Numerical Prediction of the Reduction Equivalent Fluence Bias..

$12.00 $24.00

AWWA F102-02

AWWA F102-02

Matched-Die-Molded, Fiberglass-Reinforced Plastic Weir Plates, Scum Baffles, and Mounting Brackets (..

$26.00 $52.00