Provide PDF Format
AWWA ACE68918
- Integrated Membrane Filtration Surface Water Treatment Plant: A Small System's Experience
- Conference Proceeding by American Water Works Association, 11/01/2008
- Publisher: AWWA
$12.00$24.00
This powerpoint presentation begins by providing a brief overview of a case study at the Pecan GroveMunicipal Utility District (MUD) to meet groundwater reductionrequirements by building a 2 mgd, base load, surface water treatmentplant. Source water quality challenges are presented, along with the bench-scale test overview, thepilot test overview, and the full-scale plant layout. Presentation summary includes the following: integrated membranes were selected to meetthe District's water quality goals;successfully completed pilot testing; and, pilot test report is submitted to TCEQ forreview. Includes tables, figures.