• AWWA ACE69003
Provide PDF Format

Learn More

AWWA ACE69003

  • LT2ESWTR Compliance for the Fallbrook PUD Red Mountain Reservoir
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by presenting a brief overview of the LT2ESWTR as a regulatory driver: concerned with uncoveredfinished water reservoir provisions;separate from "Toolbox";"Inactivation and/or Removal"; and,enabling technology - UV. Process options are presented, along withphysical setting,system hydraulics,water quality,equipment pre-selection, andfacility design. Presentation conclusions indicate the following:UV/Cl2/NH2Cl system received conditionalapproval;health official(s) input attechnology/approach screening, validationworkshop, 30%, 60%, and 90% design;system sized for future flow and waterquality challenges;successful pre-selection;project going to bid in late-2008; and,construction and start-up in 2009. Includes tables, figures.

Related Products

AWWA INF53948

AWWA INF53948

A Toolkit for Water Main Renewal Planning..

$12.00 $24.00

AWWA INF53990

AWWA INF53990

Design Build of Innovative Ultrafiltration Plant Meets Water Quality Demands and Delivery Schedule..

$12.00 $24.00

AWWA WQTC50359

AWWA WQTC50359

Can the ICR Method Be Saved?..

$12.00 $24.00

AWWA JAW60537

AWWA JAW60537

Journal AWWA - Water-Soluble Pesticides in Finished Water of Community Water Supplies..

$15.00 $30.00