• AWWA ACE70483
Provide PDF Format

Learn More

AWWA ACE70483

  • Frontline Responses to Treatment Plant Optimization: Experiences from the City of Houston's East Water Purification Plant
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation discusses a project at the City of Houston's (Texas) East Water Purification Plant (EWPP) called the Treatment Optimization and Support Project(TOSP). It was initiated in 2008 as amulti-year project for theoptimization ofsurface water plants,groundwater plants, re-pump stations, and thedistribution system. Project goals were toreduce chemical/energy costs, andmaintain superior water quality. Key drivers for the study are provided, along with a brief overview of Houston's EWPP, a comprehensive performance evaluation (CPE), and performance limiting factors (PLFs). Includes tables, figures.

Related Products

AWWA WQTC60611

AWWA WQTC60611

Comparison of an Anionic Polymer to No Polymer Addition for Treating Filter Backwash Water..

$12.00 $24.00

AWWA MTC64524

AWWA MTC64524

Integrated Approach to Construction and Startup of the 96 mgd Lakeview WTP for the Region of Peel..

$12.00 $24.00

AWWA INF52174

AWWA INF52174

Field Performance Monitoring of a Sliplined Watermain..

$12.00 $24.00

AWWA ACE59836

AWWA ACE59836

Water Conservation in Georgia Bringing Efficiency into Mainstream Thinking..

$12.00 $24.00