• AWWA ACE70659
Provide PDF Format

Learn More

AWWA ACE70659

  • A Case Study of Water Management During a Drought
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of the East Bay Municipal Utility District's (EBMUD's) water supply system. EBMUD's 2008 drought management program is presented that included public notification and customer outreach programs. Results of the 2008 drought program are presented, along with plans for future water supply management. Includes tables, figures.

Related Products

AWWA WQTC65833

AWWA WQTC65833

Installation of a High Rate Magnetic Ion Exchange Process to Bring a Groundwater System into Complia..

$12.00 $24.00

AWWA ACE68745

AWWA ACE68745

Transient Analysis of Sudden Pump Shutdown: Experience Gained from the Coyote Springs Project..

$12.00 $24.00

AWWA IMTECH59635

AWWA IMTECH59635

Plant Automation Using Fieldbus Technology in the Water Industry..

$12.00 $24.00

AWWA ACE93178

AWWA ACE93178

Fusion Bonded Epoxy for Flow Efficiency and Corrosion Protection of Steel and Ductile Iron Pipe..

$12.00 $24.00