• AWWA ACE70710
Provide PDF Format

Learn More

AWWA ACE70710

  • Modifying Work Processes to Optimize Use of Available Staffing
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


The powerpoint presentation begins by providing a brief overview of the traditional water utility approach to organization and risks to adequacy of employeeknowledge and skill. The organizational structure for the new Seymour-Capilano Filtration Plant at the Metro Vancouver Water Treatment System is presented, and represents: a new plant built with highly automated, less-attended design philosophy; an opportunity to standardize job duties and flatten structure to simplify shift schedule; and, offers benefits for staff including flexibility, variety, opportunities for advancement and time for training. The training program for the new plant is outlined, along with the Neural Network Modeling Tooland Expert Systems Tools, and the J.D. Phillips North Reclamation Facility in Colorado Springs, Colorado. Includes table.

Related Products

AWWA WQTC65946

AWWA WQTC65946

Nitrosamine, Nitrile and Nitramine Formation Relevant to Nitrification Control..

$12.00 $24.00

AWWA ACE61607

AWWA ACE61607

The Benefits of Using Large Diameter Fiberglass Casing in ASR Wells..

$12.00 $24.00

AWWA JAW72811

AWWA JAW72811

Journal AWWA - Lead Removal from Tap Water Using POU Devices..

$15.00 $30.00

AWWA ACE71031

AWWA ACE71031

Knowledge Management and Retention..

$12.00 $24.00