• AWWA ACE70758
Provide PDF Format

Learn More

AWWA ACE70758

  • Cost-effective Stage 2 D/DBPR Compliance Options
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of Stage 2 TTHM and HAA5 limits. Disinfection byproduct (DBPs) formation is outlined, along with an overview of options to lower DBP concentrations. Conclusions on DBP optimization: select a conservative goal; evaluate existing conditions; optimize existing facilities for low costcompliance; determine if probability of compliance isacceptable or if improvements are needed usinga safety factor; evaluate options to meet targets throughdesktop, bench and/or pilot tests; and, perform cost-effective analysis of alternativesand implement the solutions. Includes table, figures.

Related Products

AWWA WQTC50435

AWWA WQTC50435

Treatment Strategies for Removal of Microbial and Other Contaminants From Spent Filter Backwash Wate..

$12.00 $24.00

AWWA ACE60021

AWWA ACE60021

Public/Private Fast-Track Pipe Replacement Program Approach Results in More Than Just Infrastructure..

$12.00 $24.00

AWWA JAW6687

AWWA JAW6687

Journal AWWA - Alternatives for Controlling Organics in Groundwater Supplies ..

$15.00 $30.00

AWWA ACE95130

AWWA ACE95130

Considerations for the Planning and Design of Improvements to an Existing Water Supply Facility..

$12.00 $24.00