• AWWA ACE70758
Provide PDF Format

Learn More

AWWA ACE70758

  • Cost-effective Stage 2 D/DBPR Compliance Options
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of Stage 2 TTHM and HAA5 limits. Disinfection byproduct (DBPs) formation is outlined, along with an overview of options to lower DBP concentrations. Conclusions on DBP optimization: select a conservative goal; evaluate existing conditions; optimize existing facilities for low costcompliance; determine if probability of compliance isacceptable or if improvements are needed usinga safety factor; evaluate options to meet targets throughdesktop, bench and/or pilot tests; and, perform cost-effective analysis of alternativesand implement the solutions. Includes table, figures.

Related Products

AWWA CSC95006

AWWA CSC95006

Standards for Model Calibration..

$12.00 $24.00

AWWA ACE65218

AWWA ACE65218

WaterWorks: Managing Phoenix's CIP..

$12.00 $24.00

AWWA ACE94210

AWWA ACE94210

Effect of Membrane Type on the Removal of Cryptosporidium Parvum, Giardia Muris, and MS2 Virus..

$12.00 $24.00

AWWA WQTC71457

AWWA WQTC71457

Is the Ground Water Rule Driving You to Disinfect?..

$12.00 $24.00