• AWWA ACE70758
Provide PDF Format

Learn More

AWWA ACE70758

  • Cost-effective Stage 2 D/DBPR Compliance Options
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of Stage 2 TTHM and HAA5 limits. Disinfection byproduct (DBPs) formation is outlined, along with an overview of options to lower DBP concentrations. Conclusions on DBP optimization: select a conservative goal; evaluate existing conditions; optimize existing facilities for low costcompliance; determine if probability of compliance isacceptable or if improvements are needed usinga safety factor; evaluate options to meet targets throughdesktop, bench and/or pilot tests; and, perform cost-effective analysis of alternativesand implement the solutions. Includes table, figures.

Related Products

AWWA WQTC57100

AWWA WQTC57100

Adaptation of Method 1622 for Cryptosporidium for Analysis of Wastewater..

$12.00 $24.00

AWWA C203-15

AWWA C203-15

Coal-Tar Protective Coatings and Linings for Steel Water Pipe..

$41.00 $81.00

AWWA C512-15

AWWA C512-15

Air Release, Air/Vacuum, and Combination Air Valves for Waterwork and Wastewater Service..

$41.00 $81.00

AWWA 51637

AWWA 51637

New Customer Data Management System Will Improve Service to BIG Customers..

$12.00 $24.00