• AWWA ACE70841
Provide PDF Format

Learn More

AWWA ACE70841

  • Cost of Compliance: Financial Impacts of Meeting the Radionuclides Rule for Over 30 Systems in Colorado
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of the CO-RADS goals:offer compliance and technical assistance tocommunities struggling to comply with theRadionuclides Rule at no cost to the systems; andultimately, help water systems resolveradionuclides violations. Malcolm Pirnie's scope of work is presented, along with the key project objective of developing 33 system-specificpreliminary engineering reports to help identify acompliance alternative. Compliance challenges and other water quality challenges are presented, along with compliance options, a list of small system compliance technologies for radionuclides and limitations of use, evaluation criteria andweightings, AACE cost estimate classifications, example of an uranium system, impact on CO-RADS systems, current status of CO-RADS, Colorado Department of Public Health and Environment position, external movement, and value of CO-RADS reports. Includes tables, figures.

Related Products

AWWA ACE93116

AWWA ACE93116

Water Filtration Plant Process Reliability Assessment..

$12.00 $24.00

AWWA JAW61919

AWWA JAW61919

Journal AWWA - Numerical Methods for Modeling Transient Flow in Distribution Systems..

$15.00 $30.00

AWWA JAW48533

AWWA JAW48533

Journal AWWA - Optimizing Enhanced Coagulation With PAC: A Case Study..

$15.00 $30.00

AWWA ACE63243

AWWA ACE63243

Pretreatment for Seawater Desalination..

$12.00 $24.00