• AWWA ACE70917
Provide PDF Format

Learn More

AWWA ACE70917

  • Greater Cincinnati Water Works: The Great Tennyson Pump Station Mystery
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of the Greater Cincinnati Water Works (GCWW), with special focus on the Tennyson Pump Station and the issue of inconsistency with pumping 100 MGD. Hydraulic transient analysis was performed, and an attempt was made to bring all 6 pumps online under the following two scenarios: Scenario 1 - start EH pumps under normal conditions andbring CS pumps online by manually isolating all the primeto the pump and bleed air from casing, keeping cone checkclosed until adequate pressure is developed and then openvalve; and, Scenario 2 - have EH pumps running and bring CS pumpson during "normal" operation (i.e., normal priming conditionand no air relief from casing) except cone check valve heldclosed until adequate pressure reached. Includes tables, figures.

Related Products

AWWA ACE99335

AWWA ACE99335

Statistical Models for Assessing the Technical State of Water Networks - Some European Experiences..

$12.00 $24.00

AWWA ACE95208

AWWA ACE95208

What Do Your Customers Really Think?..

$12.00 $24.00

AWWA ACE54380

AWWA ACE54380

Reclaimed Water as a Water Supply Strategy in the State of Texas..

$12.00 $24.00

AWWA ACE92007

AWWA ACE92007

Overview of System Development Charges..

$12.00 $24.00