• AWWA ACE70977
Provide PDF Format

Learn More

AWWA ACE70977

  • Challenges and Benefits of Designing and Implementing a Non-Potable Water System
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of the town of Chapel Hill, North Carolina's storm water issues and supply reliability issues. The University of North Carolina's reclaimed water system is presented, along with its non-potable water system design and construction. Topics presented include: mixed-use development; cistern design concept; storm water detention structure; point-of-use disinfection; Hooker Field phase; metering; cost; cross connection prevention; disinfection issues; distribution system issues; uncontrolled rainwater quality; plumbing materials impacts; premise potable water impacts; extensive need for training; and, public education. Benefits include environmental stewardship, regulatory compliance, reliability, and cost avoidance. Includes table, figure.

Related Products

AWWA CSC92014

AWWA CSC92014

Welcome to Process Control LAN0030..

$12.00 $24.00

AWWA C515-01

AWWA C515-01

Reduced-Wall, Resilient-Seated Gate Valves for Water Supply Service..

$33.00 $65.00

AWWA C516-10

AWWA C516-10

Large-Diameter Rubber-Sealed Butterfly Valves, 78 in (2000mm) and Larger..

$58.00 $115.00

AWWA ACE68981

AWWA ACE68981

Sampling to Success: Water Quality Data Management at York Region..

$12.00 $24.00