• AWWA ACE71042
Provide PDF Format

Learn More

AWWA ACE71042

  • Permitting Desalination Facilities: A Utility Practitioner's Perspective
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of desalination permitting vs. conventional water plant permitting. Key desalination plant permits are presented, along with key challenges of concentrate management, local wastewater treatmentplant issues, Carlsbad Desalination Planttotal carbon footprint (CF), Carlsbad Climate Action Plan -Roadmap for CF Reduction, Energy Efficient Technology andDesign, and Green Building Design and Solar Panels. Includes tables.

Related Products

AWWA WQTC58890

AWWA WQTC58890

Characteristics of Full-Scale MF/UF Plants..

$12.00 $24.00

AWWA JAW49820

AWWA JAW49820

Journal AWWA - Legislation/Regulation -- Complying With the Interim Enhanced Surface Water Treatment..

$15.00 $30.00

AWWA CSC92085

AWWA CSC92085

Evolution of Water Quality and Modeling of Chlorine Concentration in Distribution Network..

$12.00 $24.00

AWWA IMTECH64737

AWWA IMTECH64737

Case Study: Developing a GIS Data Set for Pipeline Prioritization and Replacement, Dallas Water Util..

$12.00 $24.00