• AWWA ACE71093
Provide PDF Format

Learn More

AWWA ACE71093

  • Simultaneous Compliance with Stage 2 DBPR and the Lead and Copper Rule: A Road Map
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of soluble and particulate corrosion. A study is presented of balancing disinfectant residual withthe Lead and Copper Rule at Dartmouth, Massachusetts. Well sources were treated by greensand filtration, chlorine was added as a residual disinfectant in distributionsystem and no phosphate inhibitor was used, just pH adjustment. Water was purchased from New Bedford, MA, in summer periods. New Bedford used chloramines as residualdisinfectant. Regulatory issues faced by Dartmouth are presented, along with scale on the interior of the pipe and the influence of residual disinfectant on the scale. Methodology included small scale test simulation of pipe loop, coupon test, and performing scale analysis on existing pipe. Includes table, figures.

Related Products

AWWA DSS91004

AWWA DSS91004

Disaster Preparedness Case History: Charleston CPW's Water Distribution Department Responds to Hurri..

$12.00 $24.00

AWWA ACE65618

AWWA ACE65618

Water Resources Acquisition Plan - Changing Faces of Source Water Supplies: Phoenix Perspective..

$12.00 $24.00

AWWA ACE71039

AWWA ACE71039

Public Health and Related Regulatory Issues in Delivering Desalinated Water..

$12.00 $24.00

AWWA MTC93022

AWWA MTC93022

The Regulation of Concentrate Disposal in Florida..

$12.00 $24.00